NEWS
Page 1 of 22
CORPORATE

27/12/2017

Contact
info@speag.com

 

Farewell Fin Bomholt

All of Z43 gathered around the bar to bid a fond farewell to Dr. Fin Bomholt, SPEAG's Director Research & Development, on the occasion of his retirement.

 
CORPORATE

18/12/2017

Contact
info@speag.com

 

Winter 2017 Info Day at Z43

On Thursday, December 14, Niels Kuster delivered his annual "State of Z43" report to all employees. The presentation was followed by an apéro, where Niels was presented with a life-size portrait of himself!

 
MEASUREMENT

05/12/2017

Contact
info@speag.com

 

UID Summary Updates

Updated communication system summary for usage with DASY6 and cSAR3D.

 
CORPORATE

13/11/2017

Contact
info@speag.com

 

Future Photonics Engineers! Z43 Future Day 2017

On Thursday, November 9, nine preteens participated in the 2017 edition of Swiss National Future Day at Z43 to assemble their own photo-active circuits and build light-sensitive robots.

 
MEASUREMENT

06/11/2017

Contact
info@speag.com

 

IEC TC106 Meetings and TCB Council Workshop Update

At the recent IEC TC 106 meetings in Melbourne and the TCB Council Workshop in Baltimore, major milestones towards the regulatory and standards acceptance of EM exposure assessment of emerging wireless devices were presented.

 
CORPORATE

31/10/2017

Contact
info@speag.com

 

Annual SPEAG / ZMT Hardware and Software Workshop in South Korea: A Great Success!

SPEAG and ZMT Zurich MedTech AG (ZMT) held their annual South Korea Hardware and Software Workshop at the Gachon Convention Center in Sungnam-si, Gyeonggi-do, South Korea on 27 October 2017. Approximately 180 engineers and scientists from leading companies, universities, and government institutions of South Korea attended the event, which, as always, was a great success.

 
MEASUREMENT

31/10/2017

Contact
info@speag.com

 

cSAR3D: The Only Vector SAR System to Fully Meet the Demanding Requirements of IEC 62209-3

Recent tests from independent laboratories have shown that cSAR3D meets the stringent requirements of draft IEC 62209-3. All evaluated cSAR3D systems pass the validation protocol.

 
MEASUREMENT

24/10/2017

Contact
info@speag.com

 

First FCC Approval Achieved with SPEAG 5G Module

The FCC has recently granted the first RF exposure type approval for a WiGig embedded wireless communication module. Compliance with FCC limits was demonstrated with SPEAG’s 5G solution.

 
MEASUREMENT

17/10/2017

Contact
info@speag.com

 

System Check and Validation Sources for 5G

Last milestone in instrumentation for smooth 5G certification achieved.

 
Page 1 of 22
 
 
LATEST NEWS
 
 
 
UID Summary Updates
05/12/2017
 
 
 
UID Summary Updates
01/08/2017
 
cDASY6 Release V6.4
22/06/2017
 
created and designed by R.Ø.S.A.